Manufactured Building Fee Schedule

On a new site/undeveloped land (fees effective 1/1/17)

Manufactured Home (MH) Fees

State Manufactured Home Placement Permit
$350
Additional Required City Inspections (not included in State permit)
$200
Electric Service Inspection
$50

Factory Built Building (FBB) Fees

Residential FBB
$450.00 per story
Commercial FBB
$4.50/L.F. per story

Water & Wastewater Fees

Wastewater System Capacity Fee
$3,383.00
3/4" Water System Capacity Fee
$1,454.00
3/4" Water Meter Fee
$254.04
Turn on Fee
$25.00
Security Deposit (May be waived with a letter of credit from a utility company)
$150.00

Development Fees

Library Facilities Development Fee
$180
Streets Facilities (Transportation) Development Fee
$1,112

TOTAL FEES

Updated: 1/11/17
MH replacement on developed lot
$600.00
MH placement on undeveloped lot
$7,158.04
One (1) story Residential FBB on developed lot
$450.00
One (1) story Residential FBB on undeveloped lot
$7,008.04